Sunday on Calendar | 80/20 Endurance

Sunday on Calendar

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #9340
    BertsARunner
    Participant

    How do I move Sunday to the first day of the week, before Monday instead of after Saturday?

    I think that will fix my long run question:⤵️

    How do I move the long run to sunday? It’s somehow on monday…
    I’m running the 10 week maintenance plan loaded off training peaks onto garmin connect.

    #9346
    David Warden
    Keymaster

    Berts, this issue is addressed in our document Getting Started with 80/20 Training but I have include the relevant section below for your convenience:

    Q: How can I change which day of the week my rest day is?

    A: 80/20 plans don’t assign a particular day of the week as a rest day, but the rest day is always Day 1 of the week. For example, if you load your plan to start on a Monday, the rest day is always on a Monday. If you load your plan to start on a Sunday, the rest day is on Sunday. Or, you can just move the rest day and adjust other workouts as described in the question above.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.